SCADA for Alameda County Water District

Alameda County Water District implemented a modern, scalable SCADA system that allowed for better visibility, reporting and control.

Read More
Read More
MillerKnoll MES & SPC

Miller Knoll implemented a Manufacturing Execution System to facilitate and track production while playing well with their existing automation software.

Read More
Read More
American SpiralWeld Pipe

Steel pipe manufacturer improves operational efficiency through SCADA, MES and SPC at their greenfield site.

Read More
Read More
Warren County Water District

Vertech harnessed the power of Ignition Perspective to significantly enhance the SCADA system and improve operations across 131 separate stations.

Read More
Read More
SB Energy Enterprise SCADA

SB Energy engaged Vertech to provide a single-platform SCADA system to remotely oversee six solar locations and report industry-standard KPIs and data analytics in real-time.

Read More
Read More
DEPCOM: Enterprise-Level Solar Analytics with Seeq

Vertech integrated Seeq with a Solar SCADA system for scalable, state-of-the-art performance analysis to help realize significant operations savings.

Read More
Read More
Amy's Kitchen OEE System

Amy’s Kitchen replaced their high-cost software with an improved OEE solution that fit their exact process and provided flexibility for future growth.

Read More
Read More
Four Roses Bourbon

Four Roses Bourbon upgraded its production visibility with an automated Track & Trace and OEE solution on their distillery and high-speed bottling line.

Read More
Read More
AriZona Beverage

This world-class automation solution includes an ISA-88-compliant batch control system that interacts with every level of the automation stack, from device control to ERP.

Read More
READ MORE
Amarillo International Airport Baggage Handling System Vertech helped the Amarillo International Airport meet strict, modern TSA security requirements by upgrading its Baggage Handling System (BHS). READ MORE
SEE MORE
Control System Upgrade at Two Waste Water Treatment Facilities

Vertech implemented a control system upgrade for two waste water treatment facilities without plant interruption with 10 new panels and a new remote I/O.

SEE MORE
Read More
Craft Brewery WhiteBox MES System Vertech implemented a Brewery Automation System using Inductive Automation’s Ignition software for dynamic plant performance tracking. Read More
Read More
Creating the Ultimate SCADA system for Solar Energy

Solar energy is a growing industry, but utility-scale solar power plants can present many challenges for a traditional SCADA system.

Read More
Read More
Georgia Power 30MW Solar SCADA System Vertech implemented a SCADA System with a full Allen-Bradley and Rockwell software package for Georgia Power. Read More
Read More
Precision 2D Measurement Vertech implemented software to improve manufacturing efficiency by collecting, storing and analyzing production data. Read More
Read More
Santa Elena Silver Mine SCADA System Vertech implemented and documented a SCADA system for the Santa Elena Silver Mine for improved monitoring and process control. Read More
Read More
Upgrading an Aging Rockwell-Based Control System with Minimal Downtime A leader in developing innovative high-performance mixed-signal solutions was facing several issues with an aging control system for its pure water plant. Read More
Read More
Water Utility Distributed SCADA System and Automated Demand Response Vertech helped Adelanto, CA implement an automated demand response system for its water utility assets and reduce energy usage by 50% during CPP events. Read More
Read More
SCADA Telemetry Network Modernization Vertech helps suburban Phoenix, Arizona water district upgrade its aging radio telemetry network with a central SCADA system. Read More
Read More
60k Forging Press System Upgrade Vertech integrated existing and supervisory PLCs with SCADA software to help Weber Metals optimize the largest aerospace forging press in the Western Hemisphere. Read More
Read More
Well Field SCADA with Ignition 8.0 and Perspective The goal of this project was to develop an enterprise data platform architecture and pilot the system at a single site location. Read More

READY TO TAKE CONTROL?

The control freaks at Vertech love a good challenge, and we’re ready to get to work. Drop us a line!

GET STARTED